Project management system on piling project (bored-cast-in-place pile)

The aim of this report is to evaluate the effectiveness of a project management system currently adopted by a local piling company. The scope encompasses the identification of common problems associated with a piling project. The project management system shown in the form of a flow chart is discuss...

Full description

Saved in:
Bibliographic Details
Main Author: Ng, Lay Hua.
Other Authors: Alum, Jahidul
Format: Theses and Dissertations
Published: 2009
Subjects:
Online Access:http://hdl.handle.net/10356/19380
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
id sg-ntu-dr.10356-19380
record_format dspace
spelling sg-ntu-dr.10356-193802020-09-26T21:22:19Z Project management system on piling project (bored-cast-in-place pile) Ng, Lay Hua. Alum, Jahidul Centre for Advanced Construction Studies DRNTU::Engineering::Civil engineering::Construction management The aim of this report is to evaluate the effectiveness of a project management system currently adopted by a local piling company. The scope encompasses the identification of common problems associated with a piling project. The project management system shown in the form of a flow chart is discussed and an application of the system in a completed project is studied. The major process of the bored pile installation is translated into a flow diagram using Powersim Software and each variable used is formulated. The model is simulated for 100 times and a simulated construction period is obtained. A sensitivity analysis of the model is also carried out on the allocation of resources. Master of Science (International Construction Management) 2009-12-11T09:00:48Z 2009-12-11T09:00:48Z 1997 1997 Thesis http://hdl.handle.net/10356/19380 NANYANG TECHNOLOGICAL UNIVERSITY 140 p. application/pdf
institution Nanyang Technological University
building NTU Library
country Singapore
collection DR-NTU
topic DRNTU::Engineering::Civil engineering::Construction management
spellingShingle DRNTU::Engineering::Civil engineering::Construction management
Ng, Lay Hua.
Project management system on piling project (bored-cast-in-place pile)
description The aim of this report is to evaluate the effectiveness of a project management system currently adopted by a local piling company. The scope encompasses the identification of common problems associated with a piling project. The project management system shown in the form of a flow chart is discussed and an application of the system in a completed project is studied. The major process of the bored pile installation is translated into a flow diagram using Powersim Software and each variable used is formulated. The model is simulated for 100 times and a simulated construction period is obtained. A sensitivity analysis of the model is also carried out on the allocation of resources.
author2 Alum, Jahidul
author_facet Alum, Jahidul
Ng, Lay Hua.
format Theses and Dissertations
author Ng, Lay Hua.
author_sort Ng, Lay Hua.
title Project management system on piling project (bored-cast-in-place pile)
title_short Project management system on piling project (bored-cast-in-place pile)
title_full Project management system on piling project (bored-cast-in-place pile)
title_fullStr Project management system on piling project (bored-cast-in-place pile)
title_full_unstemmed Project management system on piling project (bored-cast-in-place pile)
title_sort project management system on piling project (bored-cast-in-place pile)
publishDate 2009
url http://hdl.handle.net/10356/19380
_version_ 1681059624858419200