Report on industrial attachment with Offshore Construction Specialists
During 22 weeks of Industrial Attachment program with Offshore Construction Specialists, the author has gained valuable knowledge about the offshore industry. This report contains two main projects that the author was involved in. Covering the engineering aspects was Project Kangean in which the aut...
Saved in:
Main Author: | Tay, Keng Kai. |
---|---|
Other Authors: | Low Ying Min |
Format: | Industrial Attachment (IA) |
Language: | English |
Published: |
2012
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/50831 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Report on industrial attachment with L & M Concrete Specialists
by: Loh, Andy Peng Loong.
Published: (2008) -
Report on industrial attachment with PWD Consultants
by: Ong, Chin Kai.
Published: (2008) -
Final report for industrial attachment with Ching Soon Construction Pte Ltd
by: Chua, Heng Choon.
Published: (2008) -
Student industrial attachment report with Greatearth Construction Pte Ltd (Visioncrest Project)
by: Yap, Swee Fong.
Published: (2008) -
Report on industrial attachment with KBR
by: Poo, Sue Xin.
Published: (2009)