Report on industrial attachment with CS Bored Pile System Pte. Ltd

In this report, the author will give in depth description of the various aspects of bored piling works, from the early tendering stage to the completion of bored piling works.

Saved in:
Bibliographic Details
Main Author: Liow, Ming Huey.
Other Authors: School of Civil and Environmental Engineering
Format: Industrial Attachment (IA)
Published: 2008
Subjects:
Online Access:http://hdl.handle.net/10356/5152
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
id sg-ntu-dr.10356-5152
record_format dspace
spelling sg-ntu-dr.10356-51522023-03-03T17:03:53Z Report on industrial attachment with CS Bored Pile System Pte. Ltd Liow, Ming Huey. School of Civil and Environmental Engineering DRNTU::Engineering::Civil engineering In this report, the author will give in depth description of the various aspects of bored piling works, from the early tendering stage to the completion of bored piling works. 2008-09-17T10:28:48Z 2008-09-17T10:28:48Z 2004 2004 Industrial Attachment (IA) http://hdl.handle.net/10356/5152 Nanyang Technological University 56 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
topic DRNTU::Engineering::Civil engineering
spellingShingle DRNTU::Engineering::Civil engineering
Liow, Ming Huey.
Report on industrial attachment with CS Bored Pile System Pte. Ltd
description In this report, the author will give in depth description of the various aspects of bored piling works, from the early tendering stage to the completion of bored piling works.
author2 School of Civil and Environmental Engineering
author_facet School of Civil and Environmental Engineering
Liow, Ming Huey.
format Industrial Attachment (IA)
author Liow, Ming Huey.
author_sort Liow, Ming Huey.
title Report on industrial attachment with CS Bored Pile System Pte. Ltd
title_short Report on industrial attachment with CS Bored Pile System Pte. Ltd
title_full Report on industrial attachment with CS Bored Pile System Pte. Ltd
title_fullStr Report on industrial attachment with CS Bored Pile System Pte. Ltd
title_full_unstemmed Report on industrial attachment with CS Bored Pile System Pte. Ltd
title_sort report on industrial attachment with cs bored pile system pte. ltd
publishDate 2008
url http://hdl.handle.net/10356/5152
_version_ 1759856301738819584