Report on industrial attachment with CS Bored Pile System Pte. Ltd
In this report, the author will give in depth description of the various aspects of bored piling works, from the early tendering stage to the completion of bored piling works.
Saved in:
Main Author: | Liow, Ming Huey. |
---|---|
Other Authors: | School of Civil and Environmental Engineering |
Format: | Industrial Attachment (IA) |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/5152 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Similar Items
Similar Items
-
Report on industrial attachment with Sanchoon Builders Pte Ltd
by: Chan, Sau Choy.
Published: (2008) -
Report on industrial attachment with Future Builder Pte Ltd
by: Chian, Siau Chen.
Published: (2008) -
Report on industrial attachment with VSL Singapore Pte Ltd
by: Koh, Chian Meng.
Published: (2008) -
Final report for industrial attachment with Ching Soon Construction Pte Ltd
by: Chua, Heng Choon.
Published: (2008) -
Report on industrial attachment with R.J. Crocker Consultants Pte Ltd
by: Tan, Yong Hsin.
Published: (2010)