Handling arrival time uncertainties in yard crane dispatching to minimize job tardiness in container terminals
One of the common problems a yard crane dispatcher in the container terminal faces every day is to complete the given jobs on time as it is predicted. As the quay cranes’ operations depend greatly on the arriving and departing of vehicles, the vehicle must make sure not to make any delays in their s...
Saved in:
Main Author: | Li, Iemin |
---|---|
Other Authors: | Huang Shell Ying |
Format: | Final Year Project |
Language: | English |
Published: |
2014
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/58943 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Handling arrival time uncertainties in yard crane dispatching to minimize job tardiness in container terminals
by: Seah, Sheng Kiat
Published: (2015) -
Yard crane dispatching to minimize job tardiness in container terminals
by: Lim, Wei Lin.
Published: (2012) -
Embedding simulation in yard crane dispatching to minimize job tardiness in container terminals
by: Huang, Shell Ying, et al.
Published: (2013) -
Yard crane dispatching to minimize maximum tardiness of the jobs
by: Wan, Zhi Yong
Published: (2014) -
Handling ready time uncertainties in dispatching automated guided vehicles to minimize job tardiness in container terminals
by: Ng, Jun Hao
Published: (2015)