A heuristic algorithm to schedule twin yard crane to Mmnimize job tardiness in container terminals

With global trading business in the South East Asian region as well as the Greater Asian region growing rapidly, Singapore is well positioned to benefit from this upward trend of sea trade. Without expanding its resources to its maximum capacity in the various container terminals located throughout...

Full description

Saved in:
Bibliographic Details
Main Author: Chua, Jason Zhen Sheng
Other Authors: Huang Shell Ying
Format: Final Year Project
Language:English
Published: 2014
Subjects:
Online Access:http://hdl.handle.net/10356/59989
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-59989
record_format dspace
spelling sg-ntu-dr.10356-599892023-03-03T20:53:27Z A heuristic algorithm to schedule twin yard crane to Mmnimize job tardiness in container terminals Chua, Jason Zhen Sheng Huang Shell Ying School of Computer Engineering DRNTU::Engineering::Computer science and engineering::Theory of computation::Analysis of algorithms and problem complexity With global trading business in the South East Asian region as well as the Greater Asian region growing rapidly, Singapore is well positioned to benefit from this upward trend of sea trade. Without expanding its resources to its maximum capacity in the various container terminals located throughout the country, Singapore will fall behind its competitors as the maximum workload increases yearly. In order to prevent such a scenario from happening, steps must be done to improve the container terminal efficiency to cope with workload for the foreseeable future. This project aims to help container terminal minimize the vessel turnaround time. By adapting the greedy heuristics onto a double yard crane single rail mounted gantry system, we hope to explore if this rule can be extended to this setup accounting for job tardiness with two yard cranes. From this project, it shows that the combination of the ATCRSS and greedy algorithm can be applied on a double yard crane single rail mounted gantry with an additional factor which includes the safety distance between the service crane as well as the physical limitations of the yard crane setup. Bachelor of Engineering (Computer Science) 2014-05-21T07:45:37Z 2014-05-21T07:45:37Z 2014 2014 Final Year Project (FYP) http://hdl.handle.net/10356/59989 en Nanyang Technological University 32 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering::Computer science and engineering::Theory of computation::Analysis of algorithms and problem complexity
spellingShingle DRNTU::Engineering::Computer science and engineering::Theory of computation::Analysis of algorithms and problem complexity
Chua, Jason Zhen Sheng
A heuristic algorithm to schedule twin yard crane to Mmnimize job tardiness in container terminals
description With global trading business in the South East Asian region as well as the Greater Asian region growing rapidly, Singapore is well positioned to benefit from this upward trend of sea trade. Without expanding its resources to its maximum capacity in the various container terminals located throughout the country, Singapore will fall behind its competitors as the maximum workload increases yearly. In order to prevent such a scenario from happening, steps must be done to improve the container terminal efficiency to cope with workload for the foreseeable future. This project aims to help container terminal minimize the vessel turnaround time. By adapting the greedy heuristics onto a double yard crane single rail mounted gantry system, we hope to explore if this rule can be extended to this setup accounting for job tardiness with two yard cranes. From this project, it shows that the combination of the ATCRSS and greedy algorithm can be applied on a double yard crane single rail mounted gantry with an additional factor which includes the safety distance between the service crane as well as the physical limitations of the yard crane setup.
author2 Huang Shell Ying
author_facet Huang Shell Ying
Chua, Jason Zhen Sheng
format Final Year Project
author Chua, Jason Zhen Sheng
author_sort Chua, Jason Zhen Sheng
title A heuristic algorithm to schedule twin yard crane to Mmnimize job tardiness in container terminals
title_short A heuristic algorithm to schedule twin yard crane to Mmnimize job tardiness in container terminals
title_full A heuristic algorithm to schedule twin yard crane to Mmnimize job tardiness in container terminals
title_fullStr A heuristic algorithm to schedule twin yard crane to Mmnimize job tardiness in container terminals
title_full_unstemmed A heuristic algorithm to schedule twin yard crane to Mmnimize job tardiness in container terminals
title_sort heuristic algorithm to schedule twin yard crane to mmnimize job tardiness in container terminals
publishDate 2014
url http://hdl.handle.net/10356/59989
_version_ 1759853423354707968