A heuristic algorithm to schedule twin yard crane to Mmnimize job tardiness in container terminals
With global trading business in the South East Asian region as well as the Greater Asian region growing rapidly, Singapore is well positioned to benefit from this upward trend of sea trade. Without expanding its resources to its maximum capacity in the various container terminals located throughout...
Saved in:
主要作者: | Chua, Jason Zhen Sheng |
---|---|
其他作者: | Huang Shell Ying |
格式: | Final Year Project |
語言: | English |
出版: |
2014
|
主題: | |
在線閱讀: | http://hdl.handle.net/10356/59989 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | Nanyang Technological University |
語言: | English |
相似書籍
-
A heuristic algorithm to schedule twin yard crane to minimize job tardiness in container terminals
由: Wee, Benathon Yan Zhi
出版: (2015) -
Yard crane dispatching to minimize maximum tardiness of the jobs
由: Wan, Zhi Yong
出版: (2014) -
A heuristic algorithm for yard crane dispatching in container terminals
由: Lee, Zhen Jie
出版: (2014) -
Yard crane dispatching to minimize job tardiness in container terminals
由: Lim, Wei Lin.
出版: (2012) -
Handling arrival time uncertainties in yard crane dispatching to minimize job tardiness in container terminals
由: Seah, Sheng Kiat
出版: (2015)