A simulation-based analysis to improve line throughput for high-volume manufacturing
This project investigates a production line that faces fluctuating demand with seasonal pattern. The cumulative capacity exceeds the cumulative demand in a one year period; however, its expected weekly capacity is not able to meet the weekly demand during the peak season. In addition, examining its...
Saved in:
主要作者: | Xia, Hua |
---|---|
其他作者: | Appa Iyer Sivakumar |
格式: | Theses and Dissertations |
語言: | English |
出版: |
2014
|
主題: | |
在線閱讀: | http://hdl.handle.net/10356/60698 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
Simulation as a productivity improvement tool in a component manufacturing line
由: Tan, Keng Hwee.
出版: (2009) -
Modeling the impact of Kanban design to cycle time, throughput and WIP in a high volume manufacturing system
由: Sio, Dhesirey Beryl Ko
出版: (2009) -
Simulation based analysis of cycle time and throughput in semiconductor assembly process integration
由: Muruhathasan Yogathasan.
出版: (2008) -
Performance improvement simulation of a manufacturing system
由: Liu, Haoyu
出版: (2014) -
A simulation study of a PC manufacturing line
由: Tham, Chee Yuen.
出版: (2009)