From design to practice-some issues on design and construction techniques for cut and cover tunnels in D&B projects
In this study, various design and construction methods (case studies) proposed at the interfaces with existing and future developments with respect to temporary and permanent structures in the Cut an Cover Tunnels for the Kallang Paya Lebar Expressway (KPE) and Marina Line (MRT) Design and Build pr...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Theses and Dissertations |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/6689 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
id |
sg-ntu-dr.10356-6689 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-66892020-09-26T21:18:08Z From design to practice-some issues on design and construction techniques for cut and cover tunnels in D&B projects Bolem Venkata Siva Rama Krishna Ravi Prasad Wong, Wai Fan Centre for Advanced Construction Studies DRNTU::Engineering::Civil engineering::Geotechnical In this study, various design and construction methods (case studies) proposed at the interfaces with existing and future developments with respect to temporary and permanent structures in the Cut an Cover Tunnels for the Kallang Paya Lebar Expressway (KPE) and Marina Line (MRT) Design and Build projects are reviewed. Master of Science (International Construction Management) 2008-09-17T11:51:02Z 2008-09-17T11:51:02Z 2003 2003 Thesis http://hdl.handle.net/10356/6689 Nanyang Technological University application/pdf |
institution |
Nanyang Technological University |
building |
NTU Library |
country |
Singapore |
collection |
DR-NTU |
topic |
DRNTU::Engineering::Civil engineering::Geotechnical |
spellingShingle |
DRNTU::Engineering::Civil engineering::Geotechnical Bolem Venkata Siva Rama Krishna Ravi Prasad From design to practice-some issues on design and construction techniques for cut and cover tunnels in D&B projects |
description |
In this study, various design and construction methods (case studies) proposed at the interfaces with existing and future developments with respect to temporary and permanent structures in the Cut an Cover Tunnels for the Kallang Paya Lebar Expressway (KPE) and Marina Line (MRT) Design and Build projects are reviewed. |
author2 |
Wong, Wai Fan |
author_facet |
Wong, Wai Fan Bolem Venkata Siva Rama Krishna Ravi Prasad |
format |
Theses and Dissertations |
author |
Bolem Venkata Siva Rama Krishna Ravi Prasad |
author_sort |
Bolem Venkata Siva Rama Krishna Ravi Prasad |
title |
From design to practice-some issues on design and construction techniques for cut and cover tunnels in D&B projects |
title_short |
From design to practice-some issues on design and construction techniques for cut and cover tunnels in D&B projects |
title_full |
From design to practice-some issues on design and construction techniques for cut and cover tunnels in D&B projects |
title_fullStr |
From design to practice-some issues on design and construction techniques for cut and cover tunnels in D&B projects |
title_full_unstemmed |
From design to practice-some issues on design and construction techniques for cut and cover tunnels in D&B projects |
title_sort |
from design to practice-some issues on design and construction techniques for cut and cover tunnels in d&b projects |
publishDate |
2008 |
url |
http://hdl.handle.net/10356/6689 |
_version_ |
1681057734696370176 |