From design to practice-some issues on design and construction techniques for cut and cover tunnels in D&B projects
In this study, various design and construction methods (case studies) proposed at the interfaces with existing and future developments with respect to temporary and permanent structures in the Cut an Cover Tunnels for the Kallang Paya Lebar Expressway (KPE) and Marina Line (MRT) Design and Build pr...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Theses and Dissertations |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/6689 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Be the first to leave a comment!