From design to practice-some issues on design and construction techniques for cut and cover tunnels in D&B projects
In this study, various design and construction methods (case studies) proposed at the interfaces with existing and future developments with respect to temporary and permanent structures in the Cut an Cover Tunnels for the Kallang Paya Lebar Expressway (KPE) and Marina Line (MRT) Design and Build pr...
Saved in:
Main Author: | Bolem Venkata Siva Rama Krishna Ravi Prasad |
---|---|
Other Authors: | Wong, Wai Fan |
Format: | Theses and Dissertations |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/6689 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Similar Items
-
Dynamic simulation and optimisation of cut and cover excavation with strutting system
by: Narayanan, Subramaniam
Published: (2008) -
Tunnelling in soft clay : a study of the tunnelling work under Kallang Basin in the circle line MRT project in Singapore
by: Rajeevan Kuniyil Thazhe
Published: (2008) -
Ground settlement of NATM tunnels at contract T06 of Singapore DTSS project
by: Birsen Zeyrek.
Published: (2008) -
Ground behaviour due to tunnelling at MRT NEL C-705 project
by: Dave Jugo Prakoso Witjaksono
Published: (2008) -
Projective covering designs
by: Chee, Yeow Meng, et al.
Published: (2013)