Robot-oriented design for post-construction assessment
Post construction defect checking is currently done manually by human assessors. Two assessors are dispatched for each assessment. They use the sampling method along with simple measuring instruments like the spirit level and L-square to identify defects. As the construction industry strives to i...
Saved in:
Main Author: | Soh, Bryan Weida |
---|---|
Other Authors: | Tiong Lee Kong, Robert |
Format: | Final Year Project |
Language: | English |
Published: |
2016
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/68184 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Construction design management in the Singapore construction industry
by: Ling, Boon Kok.
Published: (2008) -
Risk assessment and modeling for underground cavern project construction
by: Chua, Aden Ming Jian.
Published: (2010) -
Risk assessment and modelling for underground cavern construction project
by: Woo, Tomoko Zhi 'er
Published: (2014) -
Design and build : a logical growth of construction management in the global construction industry
by: Tan, Beng Hai.
Published: (2009) -
Management of an underground MRT station construction
by: Soh, Kin Meng.
Published: (2008)