BIM 3D, 4D and 5D for schedule, budget evaluation and analysing of civil Tuas Sewer works

This report presents the findings of Building Information Modelling (BIM) for Tuas Sewer Works through my research and experience. Cases are built upon to form a strong argument to encourage the use of BIM. It is important to look into the usage of BIM modelling to explore the possibility of improvi...

Full description

Saved in:
Bibliographic Details
Main Author: Riduan Abdul Hussein
Other Authors: Tiong Lee Kong, Robert
Format: Final Year Project
Language:English
Published: 2016
Subjects:
Online Access:http://hdl.handle.net/10356/68218
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-68218
record_format dspace
spelling sg-ntu-dr.10356-682182023-03-03T17:11:22Z BIM 3D, 4D and 5D for schedule, budget evaluation and analysing of civil Tuas Sewer works Riduan Abdul Hussein Tiong Lee Kong, Robert School of Civil and Environmental Engineering DRNTU::Engineering This report presents the findings of Building Information Modelling (BIM) for Tuas Sewer Works through my research and experience. Cases are built upon to form a strong argument to encourage the use of BIM. It is important to look into the usage of BIM modelling to explore the possibility of improving the design, construction and operation quality for the first world city, Singapore. Through the implementation of building information modelling (BIM), Singapore could transform itself to be better in design, construction and operation stage in the Built Environment sector. Site visits for the Tuas Sewer were essential to analyse the 3D model and photographs were taken. These were included in the report as well to form a strong basis of argument and to also give a first-hand experience to the reader. Many developed countries such as India, United State of America, and Singapore have been using BIM for construction projects. The success rate in the usage of BIM depends greatly on the experience and knowledge of the participants. A BIM execution plan is necessary throughout the various stage of the construction to prevent counterproductive outcome. Bachelor of Engineering (Civil) 2016-05-25T02:04:15Z 2016-05-25T02:04:15Z 2016 Final Year Project (FYP) http://hdl.handle.net/10356/68218 en Nanyang Technological University 95 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering
spellingShingle DRNTU::Engineering
Riduan Abdul Hussein
BIM 3D, 4D and 5D for schedule, budget evaluation and analysing of civil Tuas Sewer works
description This report presents the findings of Building Information Modelling (BIM) for Tuas Sewer Works through my research and experience. Cases are built upon to form a strong argument to encourage the use of BIM. It is important to look into the usage of BIM modelling to explore the possibility of improving the design, construction and operation quality for the first world city, Singapore. Through the implementation of building information modelling (BIM), Singapore could transform itself to be better in design, construction and operation stage in the Built Environment sector. Site visits for the Tuas Sewer were essential to analyse the 3D model and photographs were taken. These were included in the report as well to form a strong basis of argument and to also give a first-hand experience to the reader. Many developed countries such as India, United State of America, and Singapore have been using BIM for construction projects. The success rate in the usage of BIM depends greatly on the experience and knowledge of the participants. A BIM execution plan is necessary throughout the various stage of the construction to prevent counterproductive outcome.
author2 Tiong Lee Kong, Robert
author_facet Tiong Lee Kong, Robert
Riduan Abdul Hussein
format Final Year Project
author Riduan Abdul Hussein
author_sort Riduan Abdul Hussein
title BIM 3D, 4D and 5D for schedule, budget evaluation and analysing of civil Tuas Sewer works
title_short BIM 3D, 4D and 5D for schedule, budget evaluation and analysing of civil Tuas Sewer works
title_full BIM 3D, 4D and 5D for schedule, budget evaluation and analysing of civil Tuas Sewer works
title_fullStr BIM 3D, 4D and 5D for schedule, budget evaluation and analysing of civil Tuas Sewer works
title_full_unstemmed BIM 3D, 4D and 5D for schedule, budget evaluation and analysing of civil Tuas Sewer works
title_sort bim 3d, 4d and 5d for schedule, budget evaluation and analysing of civil tuas sewer works
publishDate 2016
url http://hdl.handle.net/10356/68218
_version_ 1759856868569645056