Grouting in rock cavern : a case study

The construction of deep subsea cavern is very risky and costly. One of the major risks is water inflow into the cavern. Rock pre-grouting is used to seal the tunnels and caverns from excessive water inflow. This method has been considered to be notoriously unpredictable and relied heavily on the en...