Grouting in rock cavern : a case study
The construction of deep subsea cavern is very risky and costly. One of the major risks is water inflow into the cavern. Rock pre-grouting is used to seal the tunnels and caverns from excessive water inflow. This method has been considered to be notoriously unpredictable and relied heavily on the en...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Final Year Project |
Language: | English |
Published: |
2019
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/78081 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |