Grouting in rock cavern : a case study
The construction of deep subsea cavern is very risky and costly. One of the major risks is water inflow into the cavern. Rock pre-grouting is used to seal the tunnels and caverns from excessive water inflow. This method has been considered to be notoriously unpredictable and relied heavily on the en...
Saved in:
Main Author: | Indera, Reka Putra |
---|---|
Other Authors: | Zhao Zhiye |
Format: | Final Year Project |
Language: | English |
Published: |
2019
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/78081 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Grouting in rock cavern : a case study
by: Lim, Kan Xuan
Published: (2017) -
Grouting in rock cavern : a case study
by: Lim, Wesley Zhi En
Published: (2018) -
Grouting in rock cavern : a case study
by: Lim, Yong Han
Published: (2017) -
Grouting in rock cavern - a case study
by: Chew, Wei Kwang
Published: (2018) -
Grouting in rock caverns
by: Foo, Cheryl Yock Ping
Published: (2021)