A robust two-phase heuristic algorithm for the truck scheduling problem in a resource-constrained crossdock
This paper studies truck scheduling in a resource-constrained crossdock. The problem decides on the sequence of incoming and outgoing trucks at the dock doors of the crossdocking terminal, subject to the availability of crossdock resources including dock doors and material handling systems. The reso...
Saved in:
Main Authors: | Shakeri, Mojtaba., Low, Malcolm Yoke Hean., Turner, Stephen John., Lee, Eng Wah. |
---|---|
Other Authors: | School of Computer Engineering |
Format: | Article |
Language: | English |
Published: |
2013
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/84446 http://hdl.handle.net/10220/13131 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Truck scheduling optimization in the logistics of crossdocking
by: Shakeri, Mojtaba
Published: (2013) -
New Meta-heuristics for the Resource-constrained Project Scheduling Problem
by: LIM, Andrew, et al.
Published: (2013) -
New meta-heuristics for the resource-constrained project scheduling problem
by: Lim, A., et al.
Published: (2013) -
Crossdocking: JIT Scheduling with Time Windows
by: LI, Yanzhi, et al.
Published: (2004) -
A heuristic algorithm for yard truck scheduling and storage allocation problems
by: Lee, D.-H., et al.
Published: (2014)