Functional area lower bound and upper bound on multicomponent selection for interval scheduling
In a realistic register-transfer-level component library, there usually exist several different hardware implementations for one generic function. This gives rise to a large design space of component selection which is interleaved with the...
Saved in:
Main Authors: | Shen, Zhao Xuan, Jong, Ching Chuen |
---|---|
Other Authors: | School of Electrical and Electronic Engineering |
Format: | Article |
Language: | English |
Published: |
2010
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/91566 http://hdl.handle.net/10220/6314 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Lower bound on general minimal resource interval scheduling with arbitrary component selection
by: Shen, Z.X., et al.
Published: (2016) -
Upper-and lower-bound path-loss modeling for indoor line-of-sight environments
by: Supachai Phaiboon, et al.
Published: (2018) -
New upper and lower bounds line of sight path loss model for mobile propagation in buildings
by: Supachai Phaiboon, et al.
Published: (2018) -
Upper and lower bound solutions for pressure-controlled cylindrical and spherical cavity expansion in semi-infinite soil
by: Zhou, Hang, et al.
Published: (2020) -
Bounded model checking of compositional processes
by: SUN, Jun, et al.
Published: (2008)