Imperfect predictive maintenance model for multi-state systems with multiple failure modes and element failure dependency

The objective of this study is to develop a practical statistical model for imperfect predictive maintenance based scheduling of multi-state systems (MSS) with...

全面介紹

Saved in:
書目詳細資料
Main Authors: Tan, Cher Ming, Raghavan, Nagarajan
其他作者: School of Electrical and Electronic Engineering
格式: Conference or Workshop Item
語言:English
出版: 2010
主題:
在線閱讀:https://hdl.handle.net/10356/93527
http://hdl.handle.net/10220/6347
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
實物特徵
總結:The objective of this study is to develop a practical statistical model for imperfect predictive maintenance based scheduling of multi-state systems (MSS) with reliability dependent elements and multiple failure modes. The system is modeled using a Markov state diagram and reliability analysis is performed using the Universal Generating Function (UGF) technique. The model is simulated for a case study of a power generation transmission system. The various factors influencing the predictive maintenance (PdM) policy such as maintenance quality and user threshold demand are examined and the impact of the variation of these factors on system performance is quantitatively studied. The model is found to be useful in determining downtime schedules and estimating times to replacement of an MSS under the PdM policy. The maintenance schedules are devised based on a "system-perspective" where failure times are estimated by analyzing the overall performance distribution of the system. Simulation results of the model reveal that a slight improvement in the "maintenance quality" can postpone the system replacement time by manifold. The consistency in the quality of maintenance work with minimal variance is also identified as a very important factor that enhances the system's future operational and downtime event predictability. Moreover, the studies reveal that in order to reduce the frequency of maintenance actions, it is necessary to lower the minimum user expectations from the system, ensuring at the same time that the system still performs its intended function effectively. The model proposed can be utilized to implement a PdM program in the industry with a few modifications to suit the individual industry's needs.