Simulation-based dynamic partitioning of yard crane workload for container terminal operations

We study the problem of dynamic partitioning of the workload of yard cranes in a container terminal with the objective of expediting their service to the container-carrying vehicles, which in turn helps to reduce the vessel turnaround time. Because the workload distribution in the container storage...

Full description

Saved in:
Bibliographic Details
Main Authors: Guo, Xi, Huang, Shell Ying, Hsu, Wen Jing, Low, Malcolm Yoke Hean
Other Authors: School of Computer Engineering
Format: Conference or Workshop Item
Language:English
Published: 2011
Subjects:
Online Access:https://hdl.handle.net/10356/94303
http://hdl.handle.net/10220/7270
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
Description
Summary:We study the problem of dynamic partitioning of the workload of yard cranes in a container terminal with the objective of expediting their service to the container-carrying vehicles, which in turn helps to reduce the vessel turnaround time. Because the workload distribution in the container storage yard changes dynamically, we propose to periodically divide container yard blocks into non-overlapping zones for cranes allocated to the yard blocks, then allocate each non-overlapping zone to a distinct crane. The non-overlapping zones are separated by a safety distance so the crane clash problem and the resulting delays in operations are eliminated. To obtain the optimal partitions for each planning period, we use real time data driven simulation to estimate the dynamic workload of each yard crane in the proposed yard crane workload partition algorithms. Our experimental results show that our partition scheme is indeed able to substantially reduce vehicle waiting time.