Simulation-based dynamic partitioning of yard crane workload for container terminal operations

We study the problem of dynamic partitioning of the workload of yard cranes in a container terminal with the objective of expediting their service to the container-carrying vehicles, which in turn helps to reduce the vessel turnaround time. Because the workload distribution in the container storage...

Full description

Saved in:
Bibliographic Details
Main Authors: Guo, Xi, Huang, Shell Ying, Hsu, Wen Jing, Low, Malcolm Yoke Hean
Other Authors: School of Computer Engineering
Format: Conference or Workshop Item
Language:English
Published: 2011
Subjects:
Online Access:https://hdl.handle.net/10356/94303
http://hdl.handle.net/10220/7270
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
Be the first to leave a comment!
You must be logged in first