Model for schedule risk evaluation in subsurface explorations
10.3141/2433-03
Saved in:
Main Authors: | Lu Y., Cui Q., Chen X., Baecher G. |
---|---|
Other Authors: | BUILDING |
Format: | Article |
Published: |
National Research Council
2018
|
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/139148 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Model for Schedule Risk Evaluation of Subsurface Explorations
by: Lu Y., et al.
Published: (2018) -
Schedule Delay Risk in Subsurface Explorations
by: Cui Q., et al.
Published: (2018) -
Modeling of depleted uranium transport in subsurface systems
by: Chen, J.P., et al.
Published: (2014) -
Modeling of depleted uranium transport in subsurface systems
by: Chen, J.P., et al.
Published: (2014) -
LASEM AND PATI SUBSURFACE FAULT MODEL AT CENTRAL JAVA, INDONESIA, CONSTRUCTED BY MEANS OF MAGNETIC AND GRAVITY EXPLORATION METHODS
by: Kirbani, Sri Brotopuspito, et al.
Published: (2006)