A continuous time model for multiple yard crane scheduling with last minute job arrivals

10.1016/j.ijpe.2011.12.020

Saved in:
Bibliographic Details
Main Authors: Li, W., Goh, M., Wu, Y., Petering, M.E.H., De Souza, R., Wu, Y.C.
Other Authors: DECISION SCIENCES
Format: Article
Published: 2013
Subjects:
Online Access:http://scholarbank.nus.edu.sg/handle/10635/43988
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: National University of Singapore
id sg-nus-scholar.10635-43988
record_format dspace
spelling sg-nus-scholar.10635-439882023-10-30T22:24:06Z A continuous time model for multiple yard crane scheduling with last minute job arrivals Li, W. Goh, M. Wu, Y. Petering, M.E.H. De Souza, R. Wu, Y.C. DECISION SCIENCES Container yard operations Continuous time Last minute jobs Rolling-horizon algorithm Scheduling 10.1016/j.ijpe.2011.12.020 International Journal of Production Economics 136 2 332-343 IJPCE 2013-10-09T03:24:00Z 2013-10-09T03:24:00Z 2012 Article Li, W., Goh, M., Wu, Y., Petering, M.E.H., De Souza, R., Wu, Y.C. (2012). A continuous time model for multiple yard crane scheduling with last minute job arrivals. International Journal of Production Economics 136 (2) : 332-343. ScholarBank@NUS Repository. https://doi.org/10.1016/j.ijpe.2011.12.020 09255273 http://scholarbank.nus.edu.sg/handle/10635/43988 000301820200008 Scopus
institution National University of Singapore
building NUS Library
continent Asia
country Singapore
Singapore
content_provider NUS Library
collection ScholarBank@NUS
topic Container yard operations
Continuous time
Last minute jobs
Rolling-horizon algorithm
Scheduling
spellingShingle Container yard operations
Continuous time
Last minute jobs
Rolling-horizon algorithm
Scheduling
Li, W.
Goh, M.
Wu, Y.
Petering, M.E.H.
De Souza, R.
Wu, Y.C.
A continuous time model for multiple yard crane scheduling with last minute job arrivals
description 10.1016/j.ijpe.2011.12.020
author2 DECISION SCIENCES
author_facet DECISION SCIENCES
Li, W.
Goh, M.
Wu, Y.
Petering, M.E.H.
De Souza, R.
Wu, Y.C.
format Article
author Li, W.
Goh, M.
Wu, Y.
Petering, M.E.H.
De Souza, R.
Wu, Y.C.
author_sort Li, W.
title A continuous time model for multiple yard crane scheduling with last minute job arrivals
title_short A continuous time model for multiple yard crane scheduling with last minute job arrivals
title_full A continuous time model for multiple yard crane scheduling with last minute job arrivals
title_fullStr A continuous time model for multiple yard crane scheduling with last minute job arrivals
title_full_unstemmed A continuous time model for multiple yard crane scheduling with last minute job arrivals
title_sort continuous time model for multiple yard crane scheduling with last minute job arrivals
publishDate 2013
url http://scholarbank.nus.edu.sg/handle/10635/43988
_version_ 1781411247799926784