A continuous time model for multiple yard crane scheduling with last minute job arrivals
10.1016/j.ijpe.2011.12.020
Saved in:
Main Authors: | , , , , , |
---|---|
Other Authors: | |
Format: | Article |
Published: |
2013
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/43988 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
id |
sg-nus-scholar.10635-43988 |
---|---|
record_format |
dspace |
spelling |
sg-nus-scholar.10635-439882023-10-30T22:24:06Z A continuous time model for multiple yard crane scheduling with last minute job arrivals Li, W. Goh, M. Wu, Y. Petering, M.E.H. De Souza, R. Wu, Y.C. DECISION SCIENCES Container yard operations Continuous time Last minute jobs Rolling-horizon algorithm Scheduling 10.1016/j.ijpe.2011.12.020 International Journal of Production Economics 136 2 332-343 IJPCE 2013-10-09T03:24:00Z 2013-10-09T03:24:00Z 2012 Article Li, W., Goh, M., Wu, Y., Petering, M.E.H., De Souza, R., Wu, Y.C. (2012). A continuous time model for multiple yard crane scheduling with last minute job arrivals. International Journal of Production Economics 136 (2) : 332-343. ScholarBank@NUS Repository. https://doi.org/10.1016/j.ijpe.2011.12.020 09255273 http://scholarbank.nus.edu.sg/handle/10635/43988 000301820200008 Scopus |
institution |
National University of Singapore |
building |
NUS Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NUS Library |
collection |
ScholarBank@NUS |
topic |
Container yard operations Continuous time Last minute jobs Rolling-horizon algorithm Scheduling |
spellingShingle |
Container yard operations Continuous time Last minute jobs Rolling-horizon algorithm Scheduling Li, W. Goh, M. Wu, Y. Petering, M.E.H. De Souza, R. Wu, Y.C. A continuous time model for multiple yard crane scheduling with last minute job arrivals |
description |
10.1016/j.ijpe.2011.12.020 |
author2 |
DECISION SCIENCES |
author_facet |
DECISION SCIENCES Li, W. Goh, M. Wu, Y. Petering, M.E.H. De Souza, R. Wu, Y.C. |
format |
Article |
author |
Li, W. Goh, M. Wu, Y. Petering, M.E.H. De Souza, R. Wu, Y.C. |
author_sort |
Li, W. |
title |
A continuous time model for multiple yard crane scheduling with last minute job arrivals |
title_short |
A continuous time model for multiple yard crane scheduling with last minute job arrivals |
title_full |
A continuous time model for multiple yard crane scheduling with last minute job arrivals |
title_fullStr |
A continuous time model for multiple yard crane scheduling with last minute job arrivals |
title_full_unstemmed |
A continuous time model for multiple yard crane scheduling with last minute job arrivals |
title_sort |
continuous time model for multiple yard crane scheduling with last minute job arrivals |
publishDate |
2013 |
url |
http://scholarbank.nus.edu.sg/handle/10635/43988 |
_version_ |
1781411247799926784 |