A continuous time model for multiple yard crane scheduling with last minute job arrivals
10.1016/j.ijpe.2011.12.020
Saved in:
Main Authors: | Li, W., Goh, M., Wu, Y., Petering, M.E.H., De Souza, R., Wu, Y.C. |
---|---|
Other Authors: | DECISION SCIENCES |
Format: | Article |
Published: |
2013
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/43988 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Yard Crane Scheduling to Minimize Total Weighted Vessel Loading Time in Container Terminals
by: Huang, Shell Ying, et al.
Published: (2017) -
Development and simulation analysis of real-time yard crane control systems for seaport container transshipment terminals
by: Petering, M.E.H., et al.
Published: (2013) -
Optimizing yard crane operations in port container terminals
by: CAO ZHI
Published: (2010) -
Load scheduling of multiple yard crane systems in container terminal with buffer areas
by: Cao, Z., et al.
Published: (2014) -
A novel approach to yard planning under vessel arrival uncertainty
by: Ku, L.P., et al.
Published: (2014)