Replanning the master production schedule for a capacity-constrained job shop
Decision Sciences
Saved in:
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Article |
Published: |
2013
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/45024 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
id |
sg-nus-scholar.10635-45024 |
---|---|
record_format |
dspace |
spelling |
sg-nus-scholar.10635-450242024-11-08T16:39:42Z Replanning the master production schedule for a capacity-constrained job shop Kum Khiong, Y. Jacobs, F.R. DECISION SCIENCES Job Shop Scheduling Master Production Scheduling Repetitive Manufacturing Simulation Decision Sciences 30 3 719-748 2013-10-10T04:40:25Z 2013-10-10T04:40:25Z 1999 Article Kum Khiong, Y.,Jacobs, F.R. (1999). Replanning the master production schedule for a capacity-constrained job shop. Decision Sciences 30 (3) : 719-748. ScholarBank@NUS Repository. 00117315 http://scholarbank.nus.edu.sg/handle/10635/45024 NOT_IN_WOS Scopus |
institution |
National University of Singapore |
building |
NUS Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NUS Library |
collection |
ScholarBank@NUS |
topic |
Job Shop Scheduling Master Production Scheduling Repetitive Manufacturing Simulation |
spellingShingle |
Job Shop Scheduling Master Production Scheduling Repetitive Manufacturing Simulation Kum Khiong, Y. Jacobs, F.R. Replanning the master production schedule for a capacity-constrained job shop |
description |
Decision Sciences |
author2 |
DECISION SCIENCES |
author_facet |
DECISION SCIENCES Kum Khiong, Y. Jacobs, F.R. |
format |
Article |
author |
Kum Khiong, Y. Jacobs, F.R. |
author_sort |
Kum Khiong, Y. |
title |
Replanning the master production schedule for a capacity-constrained job shop |
title_short |
Replanning the master production schedule for a capacity-constrained job shop |
title_full |
Replanning the master production schedule for a capacity-constrained job shop |
title_fullStr |
Replanning the master production schedule for a capacity-constrained job shop |
title_full_unstemmed |
Replanning the master production schedule for a capacity-constrained job shop |
title_sort |
replanning the master production schedule for a capacity-constrained job shop |
publishDate |
2013 |
url |
http://scholarbank.nus.edu.sg/handle/10635/45024 |
_version_ |
1821231346847055872 |