Replanning the master production schedule for a capacity-constrained job shop
Decision Sciences
Saved in:
Main Authors: | Kum Khiong, Y., Jacobs, F.R. |
---|---|
Other Authors: | DECISION SCIENCES |
Format: | Article |
Published: |
2013
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/45024 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Replanning the Master Production Schedule for a Capacity Constrained Job Shop
by: Yang, Kum Khiong, et al.
Published: (1999) -
An Evaluation of Flexible Workday Policies in Job Shops
by: Yang, Kum Khiong, et al.
Published: (2002) -
Reactive repair tool for job shop schedules
by: Subramaniam, V., et al.
Published: (2014) -
Reactive recovery of job shop schedules - A review
by: Raheja, A.S., et al.
Published: (2014) -
Dynamic scheduling of manufacturing job shops using genetic algorithms
by: Chryssolouris, G., et al.
Published: (2014)