Replanning the Master Production Schedule for a Capacity Constrained Job Shop
An examination of the use of both frozen and replanning intervals for planning the master production schedule for a capacity-constrained job shop is presented. The results show that forecast error, demand lumpiness, setup time, planned lead time, and order size have a greater impact on the mean tota...
Saved in:
Main Authors: | , |
---|---|
Format: | text |
Language: | English |
Published: |
Institutional Knowledge at Singapore Management University
1999
|
Subjects: | |
Online Access: | https://ink.library.smu.edu.sg/lkcsb_research/2217 https://proquest.umi.com/pqdlink?did=49620554&sid=8&Fmt=4&clientId=44274&RQT=309&VName=PQD |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Singapore Management University |
Language: | English |