Replanning the Master Production Schedule for a Capacity Constrained Job Shop
An examination of the use of both frozen and replanning intervals for planning the master production schedule for a capacity-constrained job shop is presented. The results show that forecast error, demand lumpiness, setup time, planned lead time, and order size have a greater impact on the mean tota...
Saved in:
Main Authors: | Yang, Kum Khiong, Jacobs, F.R. |
---|---|
Format: | text |
Language: | English |
Published: |
Institutional Knowledge at Singapore Management University
1999
|
Subjects: | |
Online Access: | https://ink.library.smu.edu.sg/lkcsb_research/2217 https://proquest.umi.com/pqdlink?did=49620554&sid=8&Fmt=4&clientId=44274&RQT=309&VName=PQD |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Singapore Management University |
Language: | English |
Similar Items
-
Replanning the master production schedule for a capacity-constrained job shop
by: Kum Khiong, Y., et al.
Published: (2013) -
Comparison of Make-to-Order Job Shops with Different Machine Layouts and Production Control Systems
by: Yang, Kum Khiong, et al.
Published: (1992) -
Comparison of make-to-order job shops with different machine layouts and production control systems
by: Yang, Kum Khiong, et al.
Published: (2013) -
A Comparison of Cross Training Policies in Different Job Shops
by: YANG, Kum Khiong
Published: (2007) -
A Comparison of Job Shop Dispatching Rules Using a Total Cost Criterion
by: Yang, Kum Khiong, et al.
Published: (1994)