Scheduling a single-product reentrant process with uniform processing times
Industrial and Engineering Chemistry Research
Saved in:
Main Authors: | Lamba, N., Karimi, I.A., Bhalla, A. |
---|---|
Other Authors: | CHEMICAL & ENVIRONMENTAL ENGINEERING |
Format: | Article |
Published: |
2014
|
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/66793 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Scheduling a single-product reentrant process with uniform processing times
by: Lamba, N., et al.
Published: (2014) -
Scheduling parallel production lines with resource constraints. 1. Model formulation
by: Lamba, N., et al.
Published: (2014) -
Scheduling parallel production lines with resource constraints. 2. Decomposition algorithm
by: Lamba, N., et al.
Published: (2014) -
Scheduling parallel production lines with resource constraints. 1. Model formulation
by: Lamba, N., et al.
Published: (2014) -
Scheduling parallel production lines with resource constraints. 2. Decomposition algorithm
by: Lamba, N., et al.
Published: (2014)