Vehicle headway distribution in work zones
10.1080/23249935.2012.762564
Saved in:
Main Authors: | Weng, J., Meng, Q., Fwa, T.F. |
---|---|
Other Authors: | CIVIL & ENVIRONMENTAL ENGINEERING |
Format: | Article |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/91269 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
The process of information propagation in a traffic stream with a general vehicle headway: A revisit
by: Wang, B., et al.
Published: (2014) -
TRAFFIC DELAY ESTIMATION,OPERATIONAL STRATEGY ANALYSIS AND RISK ASSESSMENT FOR WORK ZONES.
by: WENG JINXIAN
Published: (2011) -
Optimal subwork zone length and project start time for short-term daytime work zones from the contractor's perspective
by: Meng, Q., et al.
Published: (2014) -
Optimal subwork zone length and project start time for short-term daytime work zones from the contractor's perspective
by: Meng, Q., et al.
Published: (2014) -
Estimating capacity and traffic delay in work zones: An overview
by: Weng, J., et al.
Published: (2014)