Reducing Cycle Time at an IBM Wafer Fabrication Facility
In 1991, IBM San Jose decided to produce and sell magnetic heads for computer disk drives on the open market to original equipment manufacturers. However, as IBM's wafer fabrication facility increased the number of products it manufactured, its manufacturing cycle time lengthened. Since cycle t...
محفوظ في:
المؤلفون الرئيسيون: | DEMEESTER, Lieven, TANG, Christopher S. |
---|---|
التنسيق: | text |
اللغة: | English |
منشور في: |
Institutional Knowledge at Singapore Management University
1996
|
الموضوعات: | |
الوصول للمادة أونلاين: | https://ink.library.smu.edu.sg/lkcsb_research/1064 https://ink.library.smu.edu.sg/context/lkcsb_research/article/2063/viewcontent/ReducingCycleTimeIBMWafer_1999.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
المؤسسة: | Singapore Management University |
اللغة: | English |
مواد مشابهة
-
Two-machine Flow Shop Problems with a Single Server
بواسطة: LIM, Andrew, وآخرون
منشور في: (2006) -
Dynamic Job Ordering and Slot Configurations for MapReduce Workloads
بواسطة: Tang, Shanjiang, وآخرون
منشور في: (2016) -
A fast tabu search algorithm for the group shop scheduling problem
بواسطة: Liu, S.Q., وآخرون
منشور في: (2014) -
Product development in the textile machinery industry
بواسطة: DE MEYER, Arnoud Cyriel Leo
منشور في: (1996) -
Knowledge based management: Wat is er dan wel zo nieuw [in Dutch]
بواسطة: DE MEYER, Arnoud Cyriel Leo
منشور في: (1997)