A Comparison of Dispatching Rules for Executing a Resource-Constrained Project with Estimated Activity Durations
This research examines the performance of 13 dispatching rules for executing a resource-constrained project whose estimated activity durations may differ from the actual activity durations. The dispatching rules are tested in environments characterized by three factors, namely, the order strength of...
Saved in:
Main Author: | Yang, Kum Khiong |
---|---|
Format: | text |
Language: | English |
Published: |
Institutional Knowledge at Singapore Management University
1998
|
Subjects: | |
Online Access: | https://ink.library.smu.edu.sg/lkcsb_research/2220 https://doi.org/10.1016/s0305-0483(98)00021-8 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Singapore Management University |
Language: | English |
Similar Items
-
A comparison of dispatching rules for executing a resource-constrained project with estimated activity durations
by: Yang, K.-K.
Published: (2013) -
A Comparison of Job Shop Dispatching Rules Using a Total Cost Criterion
by: Yang, Kum Khiong, et al.
Published: (1994) -
Effects of erroneous estimation of activity durations on scheduling and dispatching a single project
by: Yang, K.-K.
Published: (2013) -
Dispatching Vehicles in a Mega Container Terminal
by: Bish, Ebru K., et al.
Published: (2007) -
A computational study of representations in genetic programming to evolve dispatching rules for the job shop scheduling problem
by: Nguyen, S., et al.
Published: (2014)