An Evaluation of Due Date, Resource Allocation, Project Release and Activity Scheduling Rules in a Multi-Project Environment
This research examines the performance of due date, resource allocation, project release, and activity scheduling rules in a multiproject environment. The results show that workload sensitive due date rules always provide better due date estimates than workload insensitive due date rules. In contras...
Saved in:
Main Authors: | Yang, Kum Khiong, Sum, C. C. |
---|---|
Format: | text |
Language: | English |
Published: |
Institutional Knowledge at Singapore Management University
1997
|
Subjects: | |
Online Access: | https://ink.library.smu.edu.sg/lkcsb_research/2221 https://doi.org/10.1016/s0377-2217(96)00266-4 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Singapore Management University |
Language: | English |
Similar Items
-
An evaluation of due date, resource allocation, project release, and activity scheduling rules in a multiproject environment
by: Yang, K.-K., et al.
Published: (2013) -
A Comparison of Stochastic Scheduling Rules for Maximising Project Net Present Value
by: Yang, Kum Khiong, et al.
Published: (1995) -
A Comparison of Resource Allocation and Activity Scheduling Rules in a Dynamic Multi-Project Environment
by: Yang, Kum Khiong, et al.
Published: (1993) -
A Comparison of Dispatching Rules for Executing a Resource-Constrained Project with Estimated Activity Durations
by: Yang, Kum Khiong
Published: (1998) -
A comparison of stochastic scheduling rules for maximizing project net present value
by: Yang, K.K., et al.
Published: (2013)