Phase transitions in project scheduling
Researchers in the area of artificial intelligence have recently shown that many NP-complete problems exhibit phase transitions. Often, problem instances change from being easy to being hard to solve to again being easy to solve when certain of their characteristics are modified. Most often the tran...
محفوظ في:
المؤلفون الرئيسيون: | HERROELEN, Willy, DE REYCK, Bert |
---|---|
التنسيق: | text |
اللغة: | English |
منشور في: |
Institutional Knowledge at Singapore Management University
1999
|
الموضوعات: | |
الوصول للمادة أونلاين: | https://ink.library.smu.edu.sg/lkcsb_research/6744 https://ink.library.smu.edu.sg/context/lkcsb_research/article/7761/viewcontent/Phase_transitions_in_project_scheduling.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
المؤسسة: | Singapore Management University |
اللغة: | English |
مواد مشابهة
-
Resource-constrained project scheduling: A survey of recent developments
بواسطة: HERROELEN, Willy, وآخرون
منشور في: (1996) -
A note on the paper “Resource-constrained project scheduling: Notation, classification, models and methods” by Brucker et al.
بواسطة: HERROELEN, Willy, وآخرون
منشور في: (2001) -
Algorithms for scheduling projects with generalized precedence relations
بواسطة: DE REYCK, Bert, وآخرون
منشور في: (1999) -
A classification scheme for project scheduling problems
بواسطة: HERROELEN, Willy, وآخرون
منشور في: (1999) -
Effective project planning: Making the most of project planning tools
بواسطة: DE REYCK, Bert
منشور في: (2010)