Subcontracting and rework cost sharing in engineering-procurement-construction projects
Infrastructure development projects are overwhelmingly managed through engineering–procurement–construction (EPC) contracts, which allow a project end user to shift all project risks to a contractor. Accordingly, the International Federation of Consulting Engineers recommended a contract template ba...
Saved in:
Main Authors: | CHEN, Zhenzhen, ZHU, Wanshan, CRAMA, Pascale |
---|---|
Format: | text |
Language: | English |
Published: |
Institutional Knowledge at Singapore Management University
2023
|
Subjects: | |
Online Access: | https://ink.library.smu.edu.sg/lkcsb_research/7449 https://ink.library.smu.edu.sg/context/lkcsb_research/article/8448/viewcontent/SSRN_id4280240.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Singapore Management University |
Language: | English |
Similar Items
-
Identifying key sources of rework affecting construction cost performance
by: Hwang, B.-G.
Published: (2013) -
Licensing Contracts: Control Rights, Options and Timing
by: CRAMA, Pascale, et al.
Published: (2017) -
Measuring the Impact of Building Information Modeling on Rework
by: Kay Wei Yang
Published: (2017) -
Procurement Strategies for Multiple Inputs
by: BOYABATLI, Onur, et al.
Published: (2012) -
Multi-level subcontracting: Negative effects on construction quality, cost, time, and safety
by: Santibañez, Ryan C.
Published: (2021)