Subcontracting and rework cost sharing in engineering-procurement-construction projects
Infrastructure development projects are overwhelmingly managed through engineering–procurement–construction (EPC) contracts, which allow a project end user to shift all project risks to a contractor. Accordingly, the International Federation of Consulting Engineers recommended a contract template ba...
Saved in:
Main Authors: | CHEN, Zhenzhen, ZHU, Wanshan, CRAMA, Pascale |
---|---|
格式: | text |
語言: | English |
出版: |
Institutional Knowledge at Singapore Management University
2023
|
主題: | |
在線閱讀: | https://ink.library.smu.edu.sg/lkcsb_research/7449 https://ink.library.smu.edu.sg/context/lkcsb_research/article/8448/viewcontent/SSRN_id4280240.pdf |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
Identifying key sources of rework affecting construction cost performance
由: Hwang, B.-G.
出版: (2013) -
Licensing Contracts: Control Rights, Options and Timing
由: CRAMA, Pascale, et al.
出版: (2017) -
Measuring the Impact of Building Information Modeling on Rework
由: KAY WEI YANG
出版: (2017) -
Procurement Strategies for Multiple Inputs
由: BOYABATLI, Onur, et al.
出版: (2012) -
Multi-level subcontracting: Negative effects on construction quality, cost, time, and safety
由: Santibañez, Ryan C.
出版: (2021)