Two-Instant Reallocation in Two-Echelon Spare Parts Inventory Systems
In this paper, we study the problem of deciding when and how to perform reallocation of existing spare parts in a multi-echelon reparable item inventory system. We present a mathematical model that solves the problem when there are two reallocation instants, in response to the open challenge post by...
محفوظ في:
المؤلفون الرئيسيون: | , |
---|---|
التنسيق: | text |
اللغة: | English |
منشور في: |
Institutional Knowledge at Singapore Management University
2006
|
الموضوعات: | |
الوصول للمادة أونلاين: | https://ink.library.smu.edu.sg/sis_research/607 https://ink.library.smu.edu.sg/context/sis_research/article/1606/viewcontent/IEEE_CASE2006_Periodic_Reallocation.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
المؤسسة: | Singapore Management University |
اللغة: | English |