Two-Instant Reallocation in Two-Echelon Spare Parts Inventory Systems
In this paper, we study the problem of deciding when and how to perform reallocation of existing spare parts in a multi-echelon reparable item inventory system. We present a mathematical model that solves the problem when there are two reallocation instants, in response to the open challenge post by...
Saved in:
Main Authors: | , |
---|---|
Format: | text |
Language: | English |
Published: |
Institutional Knowledge at Singapore Management University
2006
|
Subjects: | |
Online Access: | https://ink.library.smu.edu.sg/sis_research/607 https://ink.library.smu.edu.sg/context/sis_research/article/1606/viewcontent/IEEE_CASE2006_Periodic_Reallocation.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Singapore Management University |
Language: | English |
Be the first to leave a comment!