Two-Instant Reallocation in Two-Echelon Spare Parts Inventory Systems
In this paper, we study the problem of deciding when and how to perform reallocation of existing spare parts in a multi-echelon reparable item inventory system. We present a mathematical model that solves the problem when there are two reallocation instants, in response to the open challenge post by...
Saved in:
Main Authors: | , |
---|---|
格式: | text |
語言: | English |
出版: |
Institutional Knowledge at Singapore Management University
2006
|
主題: | |
在線閱讀: | https://ink.library.smu.edu.sg/sis_research/607 https://ink.library.smu.edu.sg/context/sis_research/article/1606/viewcontent/IEEE_CASE2006_Periodic_Reallocation.pdf |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
總結: | In this paper, we study the problem of deciding when and how to perform reallocation of existing spare parts in a multi-echelon reparable item inventory system. We present a mathematical model that solves the problem when there are two reallocation instants, in response to the open challenge post by Cao and Silver(2005) to consider two or more possible reallocations within a replenishment cycle. |
---|