Age estimation of electrographite brush in generator system for optimized maintenance planning of Sirikit hydro power plant
© 2014 IEEE. This paper presents age estimation and optimal cost preventive maintenance of carbon brush in slip ring using Weibull distribution in statistical analysis. Carbon brush is used in Sirikit hydro power plant which is electrographite brush type. Weibull distribution can find mean time to f...
Saved in:
Main Authors: | Kate-Singnoy,W., Premrudeepreechacharn,S. |
---|---|
Format: | Conference or Workshop Item |
Published: |
2015
|
Online Access: | http://www.scopus.com/inward/record.url?partnerID=HzOxMe3b&scp=84918508976&origin=inward http://cmuir.cmu.ac.th/handle/6653943832/39086 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Chiang Mai University |
Similar Items
-
Preventive maintenance optimization for excitation system of bhumibol hydro power plant
by: Pansrisu S., et al.
Published: (2017) -
Preventive maintenance optimization for excitation system of bhumibol hydro power plant
by: S. Pansrisu, et al.
Published: (2018) -
POWER PLANT PLANNING ON SENGAK I MICRO HYDRO POWER PLANT, KEPAHIANG DISTRICT, BENGKULU
by: Erlang Alparizi, Mochamad -
Control Planning and Water Gate Design for Mini Hydro Power Plant in Kambangan
by: Ihsan Priambodo, Bagas -
Control Planning and Water Gate Design for Mini Hydro Power Plant in Kambangan
by: Ihsan Priambodo, Bagas