Key indicators for maintenance performance measurement: The aircraft galley and associated equipment manufacturer case study
The aim of this research was to develop a maintenance performance measurement model, based on three main steps, these being: (1) identify and screen factors affecting maintenance performance, (2) identify relevant key indicators for the measurement of maintenance performance, and (3) apply those key...
محفوظ في:
المؤلفون الرئيسيون: | Rungchat Chompu-Inwai, Rungthip Diaotrakun, Trasapong Thaiupathump |
---|---|
التنسيق: | وقائع المؤتمر |
منشور في: |
2018
|
الوصول للمادة أونلاين: | https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=84885395799&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/47571 |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
المؤسسة: | Chiang Mai University |
مواد مشابهة
-
Key indicators for maintenance performance measurement: The aircraft galley and associated equipment manufacturer case study
بواسطة: Rungchat Chompu-Inwai, وآخرون
منشور في: (2018) -
Key indicators for maintenance performance measurement: The aircraft galley and associated equipment manufacturer case study
بواسطة: Chompu-Inwai R., وآخرون
منشور في: (2014) -
Improved ICA-based mixture control chart patterns recognition using shape related features
بواسطة: Rungchat Chompu-Inwai, وآخرون
منشور في: (2018) -
Impact of kurtosis on performance of mixture control chart patterns recognition using Independent Component Analysis and neural networks
بواسطة: Trasapong Thaiupathump, وآخرون
منشور في: (2018) -
Optimal cost driver selection in activity-based costing using Shuffled frog leaping algorithm
بواسطة: Rungchat Chompu-Inwai, وآخرون
منشور في: (2018)