Investigation of 115 kV capacitor bank failure during switching in Chiang Mai 3 substation

In this contribution, the investigation on the failures of 115-kV capacitor banks during switching in Chiang Mai 3 substation is presented. The switching transient is caused by energizing an isolated bank and back-to-back switching. Close time of circuit breaker for energizing capacitor bank, system...

Full description

Saved in:
Bibliographic Details
Main Authors: Sarawut Kanitpanyacharoen, Suttichai Premrudeepreechacharn
Format: Conference Proceeding
Published: 2018
Subjects:
Online Access:https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=80053653451&origin=inward
http://cmuir.cmu.ac.th/jspui/handle/6653943832/49915
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Chiang Mai University
id th-cmuir.6653943832-49915
record_format dspace
spelling th-cmuir.6653943832-499152018-09-04T04:20:17Z Investigation of 115 kV capacitor bank failure during switching in Chiang Mai 3 substation Sarawut Kanitpanyacharoen Suttichai Premrudeepreechacharn Energy In this contribution, the investigation on the failures of 115-kV capacitor banks during switching in Chiang Mai 3 substation is presented. The switching transient is caused by energizing an isolated bank and back-to-back switching. Close time of circuit breaker for energizing capacitor bank, system loads, and power factors are varied in the simulations by PSCAD/EMTDC program to determine the causes of maximum inrush current and overvoltage. Simulation results of energizing isolated bank suggest that the maximum inrush currents occurs with a higher system load while the maximum overvoltage occurs in a lower system load. The back-to-back switching sequence of capacitor banks has given different results. Method No.1 is the most optimal sequence for energizing capacitor bank and is most likely to minimize the effects of back-to-back switching. © 2011 IEEE. 2018-09-04T04:20:17Z 2018-09-04T04:20:17Z 2011-10-13 Conference Proceeding 2-s2.0-80053653451 10.1109/NAPS.2011.6025102 https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=80053653451&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/49915
institution Chiang Mai University
building Chiang Mai University Library
country Thailand
collection CMU Intellectual Repository
topic Energy
spellingShingle Energy
Sarawut Kanitpanyacharoen
Suttichai Premrudeepreechacharn
Investigation of 115 kV capacitor bank failure during switching in Chiang Mai 3 substation
description In this contribution, the investigation on the failures of 115-kV capacitor banks during switching in Chiang Mai 3 substation is presented. The switching transient is caused by energizing an isolated bank and back-to-back switching. Close time of circuit breaker for energizing capacitor bank, system loads, and power factors are varied in the simulations by PSCAD/EMTDC program to determine the causes of maximum inrush current and overvoltage. Simulation results of energizing isolated bank suggest that the maximum inrush currents occurs with a higher system load while the maximum overvoltage occurs in a lower system load. The back-to-back switching sequence of capacitor banks has given different results. Method No.1 is the most optimal sequence for energizing capacitor bank and is most likely to minimize the effects of back-to-back switching. © 2011 IEEE.
format Conference Proceeding
author Sarawut Kanitpanyacharoen
Suttichai Premrudeepreechacharn
author_facet Sarawut Kanitpanyacharoen
Suttichai Premrudeepreechacharn
author_sort Sarawut Kanitpanyacharoen
title Investigation of 115 kV capacitor bank failure during switching in Chiang Mai 3 substation
title_short Investigation of 115 kV capacitor bank failure during switching in Chiang Mai 3 substation
title_full Investigation of 115 kV capacitor bank failure during switching in Chiang Mai 3 substation
title_fullStr Investigation of 115 kV capacitor bank failure during switching in Chiang Mai 3 substation
title_full_unstemmed Investigation of 115 kV capacitor bank failure during switching in Chiang Mai 3 substation
title_sort investigation of 115 kv capacitor bank failure during switching in chiang mai 3 substation
publishDate 2018
url https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=80053653451&origin=inward
http://cmuir.cmu.ac.th/jspui/handle/6653943832/49915
_version_ 1681423495933722624