Investigation of 115 kV capacitor bank failure during switching in Chiang Mai 3 substation
In this contribution, the investigation on the failures of 115-kV capacitor banks during switching in Chiang Mai 3 substation is presented. The switching transient is caused by energizing an isolated bank and back-to-back switching. Close time of circuit breaker for energizing capacitor bank, system...
Saved in:
Main Authors: | , |
---|---|
格式: | Conference Proceeding |
出版: |
2018
|
主題: | |
在線閱讀: | https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=80053653451&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/49915 |