#TITLE_ALTERNATIVE#
Prior to developing oil or and gas field, contractor must submit Plan of Development. It is a necessary because POD contains details of field profitable economic value and ways of development to optimize its value. POD will enable government (represented by BP Migas) to supervise contractor activiti...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/11922 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | Prior to developing oil or and gas field, contractor must submit Plan of Development. It is a necessary because POD contains details of field profitable economic value and ways of development to optimize its value. POD will enable government (represented by BP Migas) to supervise contractor activities. This study made to evaluate contractor feasibility to do TAC contract system and to estimate the economic value of XXX field study case.Evaluation use 3 skenario to sensitivity the value of oil price and acquisition value.<p> <br />
<br />
<br />
The result from this study shows that the value of oil price is in parallel with the amount of development skenario. Economic indikator calculated in this study are Rate of Return, Net Present Value and POT. |
---|