#TITLE_ALTERNATIVE#

Prior to developing oil or and gas field, contractor must submit Plan of Development. It is a necessary because POD contains details of field profitable economic value and ways of development to optimize its value. POD will enable government (represented by BP Migas) to supervise contractor activiti...

Full description

Saved in:
Bibliographic Details
Main Author: PRABOWO (NIM 12204063), BRAMONO
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/11922
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first