#TITLE_ALTERNATIVE#

Prior to developing oil or and gas field, contractor must submit Plan of Development. It is a necessary because POD contains details of field profitable economic value and ways of development to optimize its value. POD will enable government (represented by BP Migas) to supervise contractor activiti...

Full description

Saved in:
Bibliographic Details
Main Author: PRABOWO (NIM 12204063), BRAMONO
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/11922
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:11922
spelling id-itb.:119222017-09-27T10:37:31Z#TITLE_ALTERNATIVE# PRABOWO (NIM 12204063), BRAMONO Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/11922 Prior to developing oil or and gas field, contractor must submit Plan of Development. It is a necessary because POD contains details of field profitable economic value and ways of development to optimize its value. POD will enable government (represented by BP Migas) to supervise contractor activities. This study made to evaluate contractor feasibility to do TAC contract system and to estimate the economic value of XXX field study case.Evaluation use 3 skenario to sensitivity the value of oil price and acquisition value.<p> <br /> <br /> <br /> The result from this study shows that the value of oil price is in parallel with the amount of development skenario. Economic indikator calculated in this study are Rate of Return, Net Present Value and POT. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Prior to developing oil or and gas field, contractor must submit Plan of Development. It is a necessary because POD contains details of field profitable economic value and ways of development to optimize its value. POD will enable government (represented by BP Migas) to supervise contractor activities. This study made to evaluate contractor feasibility to do TAC contract system and to estimate the economic value of XXX field study case.Evaluation use 3 skenario to sensitivity the value of oil price and acquisition value.<p> <br /> <br /> <br /> The result from this study shows that the value of oil price is in parallel with the amount of development skenario. Economic indikator calculated in this study are Rate of Return, Net Present Value and POT.
format Final Project
author PRABOWO (NIM 12204063), BRAMONO
spellingShingle PRABOWO (NIM 12204063), BRAMONO
#TITLE_ALTERNATIVE#
author_facet PRABOWO (NIM 12204063), BRAMONO
author_sort PRABOWO (NIM 12204063), BRAMONO
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/11922
_version_ 1820728356812881920