#TITLE_ALTERNATIVE#
Prior to developing oil or and gas field, contractor must submit Plan of Development. It is a necessary because POD contains details of field profitable economic value and ways of development to optimize its value. POD will enable government (represented by BP Migas) to supervise contractor activiti...
Saved in:
Main Author: | PRABOWO (NIM 12204063), BRAMONO |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/11922 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: BRAMONO (NIM 15003073), TRIADI -
#TITLE_ALTERNATIVE#
by: BRAMONO (NIM 13700033), SETO -
#TITLE_ALTERNATIVE#
by: PRABOWO (NIM 15103030), WAHYU -
#TITLE_ALTERNATIVE#
by: Prabowo (NIM 19004107), Aditya -
#TITLE_ALTERNATIVE#
by: PRABOWO JAYADIKUSUMA (NIM 13003017), RYAN