#TITLE_ALTERNATIVE#

In this study, will be made of gas contract through optimization that three production well. Start with calculating Initial Gas In Place (IGIP) with production data using Material Balance method, then optimizing production on three wells through the selection opening produced well to determine the b...

Full description

Saved in:
Bibliographic Details
Main Author: ARIOTOMO (NIM 12206007); Pembimbing: Dr. Ir. Sudjati Rachmat DEA., DIMAS
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/14125
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:14125
spelling id-itb.:141252017-09-27T10:37:29Z#TITLE_ALTERNATIVE# ARIOTOMO (NIM 12206007); Pembimbing: Dr. Ir. Sudjati Rachmat DEA., DIMAS Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/14125 In this study, will be made of gas contract through optimization that three production well. Start with calculating Initial Gas In Place (IGIP) with production data using Material Balance method, then optimizing production on three wells through the selection opening produced well to determine the best development scenario. Development studies this X Field will carried out through an intregated model of reservoir system, wells and pipelines with the software MBAL (reservoir simulator), PROSPER (well simulator), dan GAP which is a software combiner MBAL and Prosper as well as modeling the surface facilities. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description In this study, will be made of gas contract through optimization that three production well. Start with calculating Initial Gas In Place (IGIP) with production data using Material Balance method, then optimizing production on three wells through the selection opening produced well to determine the best development scenario. Development studies this X Field will carried out through an intregated model of reservoir system, wells and pipelines with the software MBAL (reservoir simulator), PROSPER (well simulator), dan GAP which is a software combiner MBAL and Prosper as well as modeling the surface facilities.
format Final Project
author ARIOTOMO (NIM 12206007); Pembimbing: Dr. Ir. Sudjati Rachmat DEA., DIMAS
spellingShingle ARIOTOMO (NIM 12206007); Pembimbing: Dr. Ir. Sudjati Rachmat DEA., DIMAS
#TITLE_ALTERNATIVE#
author_facet ARIOTOMO (NIM 12206007); Pembimbing: Dr. Ir. Sudjati Rachmat DEA., DIMAS
author_sort ARIOTOMO (NIM 12206007); Pembimbing: Dr. Ir. Sudjati Rachmat DEA., DIMAS
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/14125
_version_ 1820737124686626816