#TITLE_ALTERNATIVE#

In this study, will be made of gas contract through optimization that three production well. Start with calculating Initial Gas In Place (IGIP) with production data using Material Balance method, then optimizing production on three wells through the selection opening produced well to determine the b...

Full description

Saved in:
Bibliographic Details
Main Author: ARIOTOMO (NIM 12206007); Pembimbing: Dr. Ir. Sudjati Rachmat DEA., DIMAS
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/14125
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first