#TITLE_ALTERNATIVE#
In this study, will be made of gas contract through optimization that three production well. Start with calculating Initial Gas In Place (IGIP) with production data using Material Balance method, then optimizing production on three wells through the selection opening produced well to determine the b...
Saved in:
Main Author: | ARIOTOMO (NIM 12206007); Pembimbing: Dr. Ir. Sudjati Rachmat DEA., DIMAS |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/14125 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: (NIM 12206040); Pembimbing: Dr. Ir. Sudjati Rachmat DEA., PRABUHARNOGO -
#TITLE_ALTERNATIVE#
by: (NIM 12208003); Pembimbing: Dr. Ir. Sudjati Rachmat DEA., SUWONDO -
#TITLE_ALTERNATIVE#
by: AIRLANGGA (NIM 12204014); Pembimbing: Dr. Ir. Sudjati Rachmat, DEA., GILANG -
#TITLE_ALTERNATIVE#
by: REGINA (NIM 12206021); Pembimbing: Dr. Ir. Sudjati Rachmat, DEA., ASHA -
#TITLE_ALTERNATIVE#
by: RAHMAN (NIM 12206056): Pembimbing: Dr. Ir. Sudjati Rachmat, DEA., HIBATUR