#TITLE_ALTERNATIVE#
In this study, will be made of gas contract through optimization that three production well. Start with calculating Initial Gas In Place (IGIP) with production data using Material Balance method, then optimizing production on three wells through the selection opening produced well to determine the b...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/14125 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |